
About the project
Substation bases are built to the network operator's drawings, with the cable trench and ducts formed in the slab.
The photographs show the formwork and reinforcement in place, including the boxed out cable trench, and a completed base after the pour.
Work shown
- Formwork
- Reinforcement
- Cable trench formed in the slab
- Concrete placed and finished
Project photos



Related services
More projects

School Access Path
A new tarmac access path with a brick retaining wall on school grounds.
Civil engineering
Mt Airy Business Park
Steel framed commercial units built under a design and build contract.
Design and build
Attenuation Pond and Drainage
An attenuation pond with headwalls, large diameter pipework and chambers.
DrainageDiscuss a similar project with CDH Construction
Send us the drawings and we will return a price and a programme.
