School Access Path
A new tarmac access path with a brick retaining wall on school grounds.

About the project
This project replaced a narrow access path on school grounds with a wider, even route.
The bank was cut back and held with a new brick retaining wall with stone copings. The path was edged with kerbs and surfaced in tarmac.
Work shown
- Excavation of the bank
- Brick retaining wall
- Kerb edging
- Tarmac surfacing
Before and after


Related services
More projects

Mt Airy Business Park
Steel framed commercial units built under a design and build contract.
Design and build
Attenuation Pond and Drainage
An attenuation pond with headwalls, large diameter pipework and chambers.
Drainage
HGV Yard
A heavy duty yard with tarmac surfacing, kerbing and a concrete slab.
Civil engineeringDiscuss a similar project with CDH Construction
Send us the drawings and we will return a price and a programme.
