Piled Foundations

Ground beams and substructure built over piled foundations.

Ground beam reinforcement cage in formwork over the piles

About the project

On this site the building stands on piled foundations. Once the piles were in, reinforcement cages for the ground beams were fixed inside formwork over the pile positions.

The foundations were poured across the footprint and the brick and blockwork substructure was built up from them, leaving the site ready for the superstructure.

Work shown

  • Ground beam reinforcement
  • Formwork
  • Concrete foundations
  • Brick and block substructure

Project photos

Ground beam reinforcement cage in formwork over the piles
Ground beam reinforcement cage in formwork over the piles
Foundations poured across the building footprint
Foundations poured across the building footprint
Brick and blockwork substructure built off the foundations
Brick and blockwork substructure built off the foundations
Substructure complete on the prepared site
Substructure complete on the prepared site

Discuss a similar project with CDH Construction

Send us the drawings and we will return a price and a programme.

Contact CDH Construction

Send us the drawings or a short description of the site and we will come back to you with a price and a programme.

Office  Mobile  Email 
AddressThe Heathers, 213 Main Road, Newport, Brough, East Yorkshire HU15 2QS

Commercial and residential enquiries welcome.