Equestrian Arena

Groundworks, foundations and the stone base for an equestrian arena.

Arena base with perimeter posts set

About the project

The groundworks for this equestrian arena included the excavation, the foundations for the associated building and the arena base.

Foundations were excavated and the concrete was placed by pump. The arena area was built up with a compacted stone base and the perimeter posts were set. On the building, underfloor heating pipework was laid on insulation ahead of the screed.

Work shown

  • Excavation
  • Pumped concrete foundations
  • Stone arena base
  • Perimeter posts

Project photos

Foundation excavation under way
Foundation excavation under way
Concrete pump placing foundations
Concrete pump placing foundations
Stone base laid and compacted
Stone base laid and compacted
Arena base with perimeter posts set
Arena base with perimeter posts set
Underfloor heating pipework on insulation ahead of the screed
Underfloor heating pipework on insulation ahead of the screed

Discuss a similar project with CDH Construction

Send us the drawings and we will return a price and a programme.

Contact CDH Construction

Send us the drawings or a short description of the site and we will come back to you with a price and a programme.

Office  Mobile  Email 
AddressThe Heathers, 213 Main Road, Newport, Brough, East Yorkshire HU15 2QS

Commercial and residential enquiries welcome.